Erindale GO Station Parking Structure, Mississauga

Envision. Evaluate. Excel.

Cost Consultation

The project consisted of a new above grade 6-storey parking structure including a below grade exit ramp and a bridge connection to the existing station at Level 3. The gross floor area was approximately 500,000 sq. ft. to accommodate 1,500 cars.